|
|
Section One
- Definitions |
|
For the purpose of this ordinance, the following terms have the meanings
given them.
|
|
|
a. |
Hydric Soils mean soils that are, or prior to the installation of agricultural
tile lines were saturated, flooded or ponded for substantial periods of time
during the growing season and which have developed anaerobic conditions in the
upper part. The criteria for
identifying hydric soils were developed by the National Technical Committee for
Hydric Soils, and were published in the Federal Register on February 24, 1995.
|
|
b. |
Agricultural tiling or tile lines are
underground drainage lines installed to facilitate the rapid drainage of fields
to facilitate agricultural production.
|
|
c. |
Developer is the person responsible for the
platting of any subdivision in Credit River Township. The developer may, but
need not be, the owner of the property. If
not the owner, the Developer must have sufficient authority from the owner to
apply for approval of the subdivision and to bind the owner to all agreements
required by this Ordinance.
|
|
d. |
Town Board means the Credit River Township
Board of Supervisors. |
|
e. |
Township means Credit River Township, in Scott County, Minnesota |
|
f. |
Township Engineer means the licensed engineer employed by Credit River Township |
|
g. |
Building site means an area within each
platted residential lot in Credit River Township that complies with all the
setbacks and other requirements set forth in this Ordinance and other applicable
law, and has been identified as suitable for construction of a residence and
ancillary buildings, and which contains at least two approved private sewer
locations.
|
|
|
Section Two
- Conservation and Drainage Easements |
|
a. |
The owner of property containing hydric soils may preserve the hydric soils
areas by conveying to Credit River Township or other public or conservation
agency approved by the Township a conservation and drainage easement over the
lands containing hydric soils or wetlands. |
|
b. |
If a proposed subdivision will materially increase the frequency, duration, or
volume of runoff from the proposed subdivision onto adjacent private land,
including land across a public road from the proposed subdivision, the developer
shall obtain flowage or drainage easements to accommodate such material increase
of surface water flow prior to final plat approval.
|
|
|
Section
Three - Building on Hydric Soils Prohibited; Determination
of Setbacks for Building Sites |
|
a. |
Construction
of new buildings on hydric soils is prohibited on
any residential lands within Credit River
Township. All new residences and private sewer
systems constructed oin residential lots in Credit
River Township shall be constructed only within a
building site that has been identified by the
criteria contained in this ordinance. |
|
b. |
All
residential lots in Credit River Township shall
contain a horizontal separation of at least 75
feet from all proposed building sites to all
wetlands, ponds, lakes and streams.
|
|
c. |
All
residential lots in Credit River Township shall
contain a horizontal separation of at least 75
feet from all proposed building sites to lands
containing hydric soils, unless one or more of the
following conditions apply : |
|
|
| 1. |
If
the 75 foot separation from a proposed
building site to lands containing hydric
soils results in a proposed building site
that is less than 15,000 square feet, then
the separation between the building site
and the land containing hydric soils may
be reduced by up to 50% as necessary to
achieve a 15,000 square foot building
site, if the Township Engineer first
determines that the reduction will not
adversely affect the environment, and that
a subsequent re-establishment of wetlands
in the hydric soils would not affect any
structure or sewer system constructed
within the proposed building site. |
| 2. |
If
the hydric soils are contained in a minor
drainage way with a slope greater than 2%,
then the separation from the proposed
building site to land containing hydric
soils shall be 25 feet. |
| 3. |
The
Town Board may reduce the required
separation from a proposed building site
to lands containing hydric soils for good
cause upon petition by the developer or
owner, if the Township Engineer first
determines that the reduction will not
adversely affect the environment and that
a subsequent re-establishment of wetlands
in the hydric soils would not affect any
structures or sewer systems constructed
within the proposed building site. |
| 4. |
Any
contiguous hydric soils area of less than
1/10th acre may be disregarded in the
determination of setbacks. |
|
|
d. |
The
lowest level of any residence constructed in
Credit River shall be at least one foot above the
highest level of any hydric soils with 75 feet of
the residence. |
|
e. |
The
provisions of this Section Three may be modified
by the Township Board upon a showing satisfactory
to the Board that the provisions work a hardship
on an existing lot in the Township. |
|
f. |
The provisions of this
Section Three shall not apply to any lots contained in any subdivisions approved
under the Scott County Zoning Ordinance revisions adopted in May 2001.
|
|
|
Section
Four - Streets in New Subdivisions |
|
a. |
The arrangement, character, extent, width, grade, and location of all streets in
new subdivisions in Credit River Township shall conform to this Ordinance. |
|
b. |
All streets proposed to be constructed in new subdivisions or developments shall
be designed to consider the following:
|
|
|
| 1 |
The relationship of the proposed roads to other existing and planned
roads,
|
| 2 |
Reasonable circulation of traffic,
|
| 3 |
Topographical
Conditions |
| 4 |
Surface water runoff,
|
| 5 |
Public safety and convenience,
|
| 6 |
The relationship between the proposed roads and the planned use of the
land.
|
|
|
c. |
Permanent cul-de-sacs shall not be platted where other collector or access
streets can be designed to facilitate traffic movement in a practical manner.
When cul-de-sacs are allowed, mailboxes shall be clustered and located
off the turnaround at a practical location designated on the plat.
|
|
|
Section
Five - Continuation of Existing Township Roads |
|
a. |
The arrangement of streets in a proposed subdivision shall be designed for the
appropriate continuation of existing streets and roads in adjoining areas.
The Town Board shall make the final determination as to which existing
streets and roads shall be extended into the proposed subdivision. |
|
b. |
If a street designated to be continued is not adjacent to the proposed
subdivision, the developer of the proposed subdivision shall be responsible for
the construction of the new street connection from the boundary of the proposed
subdivision to a maximum distance not to exceed the length or width, whichever
is greater, of any existing platted lot through or adjacent to which the new
street will run. If the new street
connects at an existing temporary cul-de-sac, the temporary cul-de-sac shall be
removed as part of the road construction at the expense of the developer of the
proposed subdivision.
|
|
|
Section Six
- Future Projection of Streets |
|
a. |
Where adjoining areas are not subdivided, the arrangement of streets in a
proposed subdivision shall make provision for the projection of streets into
adjoining areas by the dedication of road easements and by grading the streets
to the boundary of the proposed subdivision.
The Town Board shall make the final determination of which street
projections are appropriate. |
|
b. |
When the Town Board determines that an adjoining area requires street access
from the proposed subdivision into a future subdivision, the developer shall,
prior to the final plat being filed, do one of the following:
|
|
|
| 1 |
Construct a finished street, including the bituminous layer,
to the boundary of the proposed subdivision at the location of the projected
street; or
|
| 2 |
Pay to the Credit River Township Road Fund a nonrefundable fee equal to 75% of
the construction cost of placing base, paving, and removing any temporary
cul-de-sac constructed as part of the subdivision street.
The construction cost shall be determined by the Township Engineer.
|
|
|
|
Section
Seven - Improvement of Existing Township Roads |
|
a. |
If a proposed subdivision utilizes an existing gravel township road to access
the proposed subdivision, the developer of the proposed subdivision, at the
developer's expense, shall improve the township road to current township
guidelines, including a bituminous surface, at the time of the road construction
for the subdivision. |
|
b. |
If the proposed subdivision will result in a material increase in traffic on an
existing township road in excess of the design standards of the road, and the
existing township road must be upgraded to serve the proposed subdivision, the
owner or developer shall enter into a Developer's Agreement with the Township
and shall participate in the cost of upgrading the township road.
|
|
c. |
If the Township adopts a fee per lot for road improvements as provided for in
the Scott County Zoning Ordinance, that fee will be in lieu of the requirements
contained in paragraphs a. and b. of this Section 6.
|
|
|
Section
Eight - Escrow Accounts |
|
|
The
developer shall reimburse the Township for all costs incurred by the Township in
connection with the proposed subdivision. Such
costs shall include, but are not limited to, engineering, surveying, soil
borings, legal and administrative costs of Township employees, agents and
contractors. The developer shall
establish an escrow account with the Township in the amounts set for in this
Section, to provide for payment of these costs.
If the escrow account is depleted, the developer shall deposit additional
funds into the escrow account as requested by the Township.
The Township may withhold building permit approvals or stop lot sales for
a subdivision if an escrow account does not contain sufficient funds to
reimburse the Township for its accrued and anticipated costs, and the developer
fails to replenish the escrow account upon request of the Township.
|
|
|
Section
Nine - Subdivision Approval Process |
|
a. |
The information required to be submitted to Scott County under the Scott County
Zoning Ordinance shall also be submitted to the Township prior to a preliminary
plat. Before being placed on the
township agenda for sketch plan review, the developer shall pay a fee of $ 1,000
to the Township Clerk to be deposited in the escrow account and used for
expenses incurred by the Township regarding the proposed subdivision, including
expenses for meetings and engineering for the sketch plan.
The developer shall be responsible for all costs incurred by the Township
for the Sketch plan even if the development is not completed. |
|
b. |
Prior to the commencement of any construction activity on a proposed
subdivision, the developer shall comply with the following requirements.
|
|
|
| 1. |
Provide a survey of the proposed subdivision with a legal description showing
the proposed lots, road locations, utility easements, and other information
determined by the Township to be necessary for the subdivision.
|
| 2. |
Provide a topographic map of the proposed subdivision at a scale of no less than
I00 feet to the inch with contour intervals of no more than two feet, showing
the location of all hydric soils and wetlands.
An alternative map containing the required information, such as an aerial
topographical survey, may be used with the prior approval of the Township
Engineer.
|
| 3. |
Provide preliminary information of the desired grade and alignment of the
proposed streets to access the individual lots, including horizontal and
vertical control, prepared by a registered land surveyor. |
|
|
c. |
After the information required above has been provided to the Township, but
before the plat or subdivision is submitted for final approval by the Township,
the developer shall complete all necessary preliminary engineering work,
including soil borings, any necessary additional survey work, and preparation of
preliminary cost estimates. The
preliminary engineering work shall be under the supervision of the Township
Engineer. |
|
d. |
Upon completion of the preliminary engineering work, and upon
recommendation by
the Township Engineer, the Township shall approve the final subdivision or plat
and the Township Engineer shall design the streets and supply construction
documents |
|
e. |
Construction of proposed township roads or subdivision streets shall not proceed
until the preliminary plat has been approved by Credit River Township and Scott
County, and the final road plans and other construction documents have been
completed by the Township Engineer.
|
|
f. |
The developer shall follow the construction documents provided by the Township
Engineer, and shall allow the Township Engineer access to the subdivision to
inspect the construction. The
developer's contractor shall notify the Township Engineer when grading or other
earthmoving activity is to take place. |
|
g. |
All buildings other than a residence and a garage serving the residence shall be
removed from the subdivision as soon as the final plat is approved, unless the
buildings are included in the preliminary plat and the Town Board specifically
approves the temporary or permanent preservation of the buildings. |
|
|
Section Ten
- Developer's Agreement |
|
a. |
A Developer's Agreement is required for any proposed subdivision or other
residential development that includes proposed streets, or existing township
streets or roads that must be upgraded to serve the subdivision or development.
If the Developer's Agreement is also required by the Scott County Zoning
Ordinance, it shall be entered into by the developer, the Township, and Scott
County. Prior to placing the
preliminary subdivision plat or development plan on the Town Board agenda, the
developer shall pay an additional fee $ 1,000. 00, or more at the direction of
the Town Board, to the Township Clerk to be deposited in the escrow account and
used for expenses incurred by the Township regarding the proposed subdivision,
including additional administrative, engineering and legal expenses to review
the Developer's Agreement and Plan. Preliminary
plat information shall be submitted to the Township Engineer at least ten days
before the Town Board meeting. |
|
b. |
If a Developer's Agreement is required by this Section, the developer shall
enter into a written Developer's Agreement contract with the Township prior to
the construction of any improvements on the proposed subdivision, and prior to
approval of any final plat of any subdivision.
The contract shall require the developer to furnish and construct the
improvements contained therein at the developer's sole cost and in accordance
with the plans, specifications and conditions approved by the Township.
The contract shall include provisions for supervision of construction
activities by the Township Engineer, and grant to the Township Engineer
authority to correlate the work to be done under the contract with other road
work being done or contracted by the Township.
The contract shall require the developer to make an escrow deposit or to
furnish a letter of credit from a recognized bank in the amount of the Township
Engineer's estimate of the total cost of the subdivision streets and Township
road improvements to be completed by the developer pursuant to the contract,
including all costs to be incurred by the Township.
|
|
c. |
If the subdivision contains one or more sediment ponds, the Developer's
Agreement may require, at the option of the Township, a restrictive covenant to
be filed in the office of the Scott County Recorder that provides for the
maintenance of the sediment pond or ponds by the owners of the lots in the
subdivision, and that provides for an assessment against the lots for
maintenance of the pond or ponds.
|
|
|
Section
Eleven - Road Dedications |
|
a. |
Application by a developer or anyone wishing to dedicate a road, street or
cartway to the Township pursuant to Minnesota Statutes § 164.15, Subd. 1, shall
be made only after a Certificate of Completion has been issued by the Township
Engineer, and all costs and expenses incurred by the Township and its Engineer
have been paid. |
|
b. |
The Township may require that anyone wishing to dedicate a road, street or
cartway to the Township execute a deed conveying fee title or an easement for
the roadway to the Township, with a legal description sufficient for recording
in the office of the Scott County Recorder
|
|
|
Section
Twelve - Roadway Design Criteria |
|
a. |
Drainage - Drainage systems shall be designed to adequately convey the runoff
from a ten year return period, 24 hour storm.
The minimum pipe in street right of way shall be 18 inch aluminized
corrugated metal pipe. A drainage
study shall be submitted to the Township, which indicates that no damage will
occur to properties based on a I00-year storm event. |
|
b. |
Section - The roadway section shall be at least 4 inches of bituminous in two
lifts. The first lift shall be
MNDOT 2331 type 3 1 B, and shall be at least 2 1/2inches.
The second lift shall be MNDOT 2331 Type 41A Wear Course, and shall be at
least I 1/2inches. The base shall
be at least nine inches of Class 5 crushed rock.
If the Town Board approves a gravel road, it shall be constructed with 12
inches of class 5 crushed rock.
|
|
c. |
Horizontal Alignment - All streets shall intersect at right angles.
Horizontal alignment design speed shall be consistent with the
requirements for vertical alignment design speed.
When connecting streets deflect from each other at any one point by more
than ten degrees, they shall be connected by a curve with a radius of no less
than 200 feet. Cul-de-sacs shall
have a driveable turning radius of at least 50 feet.
|
|
d. |
Vertical Alignment - The minimum allowable ditch grade shall be 0.8%. The
minimum allowable centerline grade shall be 0.9%. Continuous changing of grades
that create a “roller coaster" effect shall not be permitted.
Design controls for vertical alignment shall be consistent with the
design speed as specified in the current edition of the "MNDOT Road Design
Manual." |
|
e. |
Road width, shoulders and right of way width shall be determined by the most
recent Credit River Township Road Policy adopted by the Town Board.
|
|
f. |
The provisions regarding roadway design contained in this Section may be
modified by the Town Board based on hardship or circumstances unique to the road
location.
|
|
g. |
Typical design cross sections are included as an appendix to this Ordinance
|
|
|
Section
Thirteen - Driveways from Township Roads |
|
a. |
Private driveways will be at least 20 feet wide, and not more than 28 feet wide,
at the intersection with the township road.
Only one driveway shall be allowed per parcel.
|
|
b. |
An application for driveway permit, along with the permit fee, shall be
delivered to the Township before construction of any driveway from a Credit
River Township road. The permit fee
shall include a fee for the permit and a driveway deposit to assure satisfactory
completion of the construction. The
driveway fee and deposit shall be set by resolution of the Town Board.
The deposit shall be returned to the applicant after a satisfactory final
inspection, unless otherwise set forth in this ordinance.
If construction of the driveway does not pass final inspection, the
driveway deposit may be used by the Township to complete the installation, or to
remove an unacceptable driveway.
|
|
c. |
All culverts shall be at least 15 inches in diameter, at least 28 feet long,
with flared ends. The Township Engineer may specify a larger culvert.
All culverts shall be new and shall be constructed of galvanized steel.
|
|
d. |
The invert of the culvert must be at least 3 inches below the edge of the
blacktop, unless otherwise approved by the Township Engineer.
|
|
e. |
No driveway shall cross a
wetland unless a wetland permit has first been obtained.
|
|
f. |
No obstructions shall be constructed or planted in the township right of way.
Obstructions include, but are not limited to, retaining structures, posts,
trees, shrubs, and other such items.
|
|
g. |
Mailboxes and support posts may be located within the Township right of way.
However, the Township is not responsible for damage to mailboxes or
posts during road maintenance or snowplowing.
|
|
h. |
A driveway must contain 4-6 inches of 3- clean rock for at least 50 feet from
the Township road before any footings are poured for construction on this
site.
|
|
i. |
Dirt or debris SHALL NOT be deposited on Township roads.
Any such dirt or debris deposited upon Township roads during construction
or otherwise shall be immediately cleaned up. Failure to clean up such dirt and
debris may result in forfeiture of the driveway deposit.
Dirt and debris includes clumps of clay, gravel, mud, sand, soil,
washings, or building materials. |
|
j. |
Upon completion of the driveway or culvert installation, including turf
restoration, and after an occupancy permit, if any, is issued, the installation
shall receive a final inspection by the Township. Refund of the driveway deposit shall be made only after final
inspection. |
|
|
Section
Fourteen - Miscellaneous |
|
a. |
The terms and provisions of this Ordinance shall supercede any provisions of
Credit River Township Ordinances 11, 11A and 11B to the extent that those
provisions are inconsistent with this Ordinance.
|
|
b. |
The Credit River Township Subdivision, Zoning, and Wetland Preservation
Ordinance is hereby repealed, having been superceded by the Scott County Zoning
Ordinance and this ordinance.
|
|
c. |
This ordinance and the various parts, sentences, paragraphs, sections and
clauses thereof are hereby declared to be severable. If any part, sentence, paragraph, section or clause is
adjudged to be unconstitutional or invalid for any reason by a court of
competent jurisdiction, such holding shall not affect the remaining portions of
this Ordinance. |
|
|
|
|